Project details
| Official title | Bhanyadi Soapstone Mining Project at Village- Bhanyadi, Tehsil- Gangolihat (Ganai Gangoli) & District- Pithoragarh, and State- Uttarakhand. (Area- 4.511 Ha). |
|---|---|
| Status | Lapsed |
| Status since | 8 May 2025 |
| Application filed | 11 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Associates Soapstone |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹72 lakh |
| Village / locality | Dasilakhet |
| Taluk / tehsil | Gangolihat |
| District | Pithoragarh |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00483 |
In context
39 applications in Pithoragarh since January 2022 are in the same category (Mining): 24 approved, 12 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.1 acres, this one is larger than 72% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 33.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Dasilakhet, Gangolihat, Pithoragarh, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhanyadhi Soapstone Mine Area — environmental approval granted, 250 m away
- Bhanyadhi Soapstone Mine Area — cleared for impact study, 250 m away
- Bhanyadi & Dasilakhet Soapstone Mining Project — cleared for impact study, 300 m away
- Danu & Oliyagaon Soapstone Mine 2.295 Ha — returned to applicant, 1.1 km away
- Danu & Oliyagaon Soapstone Mine — cleared for impact study, 1.1 km away
- Basukinaag Pumping Water Supply Scheme, Ganai-Gangoli Gangolihat — lapsed, 2.3 km away
- Vasukinag Gram Samuh Pumping Drinking Water Scheme — lapsed, 2.3 km away
- Baituli Soapstone Mining Project — environmental approval granted, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.