Quick answers
What is this project?
Sand, Bajri and Boulder mine in Song River khasra Nos. 709 & 721e0, Area- 1.00 ha by Shri Devendra Sajwan is a lapsed mining project in Ragar Gaon, Dhanaulti, Tehri Garhwal, Uttarakhand. The site covers 2.5 acres.
Who is building it?
The applicant is Devendra Sajwan.
Has it been approved?
No. The application was lapsed on 6 Mar 2025, so it is no longer under consideration.
Where is it?
In Ragar Gaon, Dhanaulti, Tehri Garhwal, Uttarakhand.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 21 Dec 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand, Bajri and Boulder mine in Song River khasra Nos. 709 & 721e0, Area- 1.00 ha by…
Project details
| Official title | Sand, Bajri and Boulder mine in Song River khasra Nos. 709 & 721e0, Area- 1.00 ha. at Village- Ragad Gaun, Tehsil - Dhanaulti, Distt.- Tehri Garhwal, (Uttarakhand) by Shri Devendra Sajwan. |
|---|---|
| Status | Lapsed |
| Status since | 6 Mar 2025 |
| Application filed | 21 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Devendra Sajwan |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Ragar Gaon |
| Taluk / tehsil | Dhanaulti |
| District | Tehri Garhwal |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00497 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 May 2025 | Environmental approval granted | 2.5 acres | ₹85 lakh |
| New project filed 21 Dec 2024 (this page) | Lapsed | 2.5 acres | ₹2.2 crore |
In context
12 applications in Tehri Garhwal since January 2022 are in the same category (Mining): 6 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 2.5 acres, this one is smaller than 83% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Ragar Gaon, Dhanaulti, Tehri Garhwal, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Bajri and Boulder mine in Song River khasra Nos. 709 & 721e0, Area- 1.00… — environmental approval granted, 0 m away
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.442… — environmental approval granted, 2.9 km away
- Sand, Bajri and Boulder mine in Song River khasra Nos. 01M, Area- 1.00 ha by… — environmental approval granted, 3 km away
- Sand, Bajri and Boulder mine in Song River khasra Nos. 01e0, Area- 1.00 ha by… — lapsed, 3 km away
- Sand, Bajri and Boulder mine in Song River khasra Nos. 01e0, Area- 1.00 ha by… — lapsed, 3 km away
- Sand, Bajri & Boulder (RBM) Mining in River Song, Khasra No 208 Area 1.860 ha… — under environmental review, 3.2 km away
- Anand Chouk GoV Pumiping Water Supply Scheme — lapsed, 5.4 km away
- Anand Chowk GoV Pumping Water Supply Scheme — lapsed, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.