Quick answers
What is this project?
Project: Proposed Diyuri-2 Sand, Bajri and Boulders Mining in Ladhiya River Khasra No. 3871, 3872, 3873 & 3887, Village- Diyuri-2, Tehsil & District - Champawat, State- Uttarakhand Area: 2.30 Ha is an approved mining project in Jhalakuri, Poornagiri, Champawat, Uttarakhand. The site covers 5.7 acres.
Who is building it?
The applicant is Minder Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Nov 2024), as of 27 Nov 2026.
Where is it?
In Jhalakuri, Poornagiri, Champawat, Uttarakhand.
How big is it?
It has a stated cost of ₹1 crore and a site of 5.7 acres.
When was it filed?
The application was filed on 19 Jun 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Nov 2024 |
| Application filed | 19 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Minder Singh |
| Land area | 5.7 acres (2.3 ha) |
| Project cost | ₹1 crore |
| Village / locality | Jhalakuri |
| Taluk / tehsil | Poornagiri |
| District | Champawat |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00504 |
In context
24 applications in Champawat since January 2022 are in the same category (Mining): 17 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.7 acres, this one is larger than 71% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Jhalakuri, Poornagiri, Champawat, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Bajri Boulder Mining Project — environmental approval granted, 550 m away
- Proposed RBM (Sand, Bajri and Boulders) mining project over an area of 0.174… — initial checks, 550 m away
- Sand, Bajri & Boulder Deposit (Area – 1.092 Ha) — cleared for impact study, 1.3 km away
- Sand, Bajri & Boulder Deposit (Area – 1.092 Ha) — cleared for impact study, 1.3 km away
- Diyuri-4 Sand, Bajri & Boulder Mining Project. — initial checks, 1.5 km away
- Diyuri-4 Sand, Bajri & Boulder Mining Project. — cleared for impact study, 1.5 km away
- Proposed Sand, Bajri, Boulder Mining project over an area of 1.36 ha by Shri… — environmental approval granted, 2 km away
- Proposed Sand, Bajri, Boulder Mining project over an area of 2.17 ha by Shri… — environmental approval granted, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.