What is Developing? Open the mapMap

Environmental approval grantedMining · Nainital, Uttarakhand

Shri Minder Singh Sand, Bajri and Boulders (RBM) Mining Project at Kosi River Khasra no 2839 C, Village-: Khairni Ke Tok Baderi, Tehsil – Betalghat, District- Nainital, State- Uttarakhand

Shri Minder Singh Sand, Bajri and Boulders (RBM) Mining Project at Kosi River Khasra no 2839 C, Village-: Khairni Ke Tok Baderi, Tehsil – Betalghat, District- Nainital, State- Uttarakhand is an approved mining project in Haroli, Kosya Kutauli, Nainital, Uttarakhand. The site covers 2.5 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Aug 2024).

See it on the live map All projects in Nainital

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Shri Minder Singh Sand, Bajri and Boulders (RBM) Mining Project at Kosi River Khasra no 2839 C, Village-: Khairni Ke Tok Baderi, Tehsil – Betalghat, District- Nainital, State- Uttarakhand is an approved mining project in Haroli, Kosya Kutauli, Nainital, Uttarakhand. The site covers 2.5 acres.

Who is building it?

The applicant is Minder Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 3 Aug 2024), as of 27 Nov 2026.

Where is it?

In Haroli, Kosya Kutauli, Nainital, Uttarakhand.

How big is it?

It has a stated cost of ₹60 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 19 Mar 2024.

Project details

StatusEnvironmental approval granted
Status since3 Aug 2024
Application filed19 Mar 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantMinder Singh
Land area2.5 acres (1 ha)
Project cost₹60 lakh
Village / localityHaroli
Taluk / tehsilKosya Kutauli
DistrictNainital
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00529

In context

54 applications in Nainital since January 2022 are in the same category (Mining): 46 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 65% of them.

No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.

Where it is

Haroli, Kosya Kutauli, Nainital, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Minder Singh in Nainital

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.