Quick answers
What is this project?
Environmental Clearance for proposed hospital facility by Jeevandhara Hospital located at Khata 884/ Khasra No. 325/1 & Khata 671, Khasra No. 326, Mauja Central Hope Town, Paragana Pachwadoon, Vikasnagar, Dehradun, Uttarakhand is an approved hospital project in Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. It plans 100 units on 0.2 acres.
Who is building it?
The applicant is Maitriyae (Jeevandhara Hospital).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Feb 2025), as of 27 Nov 2026.
Where is it?
In Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹3 crore and a site of 0.2 acres.
When was it filed?
The application was filed on 8 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Feb 2025 |
| Application filed | 8 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Maitriyae (Jeevandhara Hospital) |
| Use | Hospital |
| Units | 100 |
| Land area | 700 m² |
| Project cost | ₹3 crore |
| Village / locality | Central Hop Town |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00564 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 93% of them.
82 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Central Hop Town, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for proposed Pharmaceutical Formulations Unit by M/s… — more information requested, 600 m away
- Building project by M/s. Punjab Kesari Publishing House Private Limited — environmental approval granted, 700 m away
- Environmental clearance for proposed expansion of footwear pair manufacturing… — environmental approval granted, 750 m away
- Industrial project by Almed Printing Solutions Private Limited — environmental approval granted, 800 m away
- Proposed Expansion of Guest Room Capacity of Existing Hotel "competent Palace". — environmental approval granted, 800 m away
- Building project by Parb Pharmaceuticals Private Limited — environmental approval granted, 850 m away
- Environmental Clearance for Flexible Packaging & Brand Decoration Products… — environmental approval granted, 850 m away
- Industrial project by Cris Pharma India Limited — more information requested, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.