Quick answers
What is this project?
Sand, Bajri & Boulder Mining in River Swarna (Swarna 17/1), Khasra No 755, 1, 345 Gha, 346, 1 Ka, 817, 176, 323 Ma Area 32.32 ha out of 51.463 ha at Swarna River Section Lot No. 17/1, Tehsil- Vikasnagar, District- Dehradun, Uttarakhand by M/s Satyam Shivam Sundaram Stone Crusher is a lapsed mining project in Baktawar, Vikas Nagar, Dehradun, Uttarakhand. The site covers 79.9 acres.
Who is building it?
The applicant is Raipal Singh.
Has it been approved?
No. The application was lapsed on 14 Feb 2026, so it is no longer under consideration.
Where is it?
In Baktawar, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹70 lakh and a site of 79.9 acres.
When was it filed?
The application was filed on 24 Oct 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Feb 2026 |
| Application filed | 24 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Raipal Singh |
| Land area | 79.9 acres (32.3 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Baktawar |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00626 |
In context
96 applications in Dehradun since January 2022 are in the same category (Mining): 65 approved, 23 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 79.9 acres, this one is larger than 95% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Baktawar, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for proposed establishment of 200 TPH Stone Crusher… — environmental approval granted, 1.6 km away
- Environmental Clearance for proposed establishment of 200 TPH Stone Crusher… — environmental approval granted, 2.2 km away
- Environmental clearance for proposed establishment of 200 TPH Stone Crusher… — environmental approval granted, 2.6 km away
- 2-Lane with Paved Shoulder Connectivity between Dehradun and Mussoorie from… — under forest review, 4.2 km away
- Signature Phytochemical Industries - UNIT I — environmental approval granted, 5 km away
- Signature Phytochemical Industries - UNIT I — environmental approval granted, 5 km away
- Signature Phytochemical Industries Unit–2 — environmental approval granted, 5.1 km away
- Signature Phytochemical Industries Unit–3 — environmental approval granted, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.