Quick answers
What is this project?
Song-II Sand, Bajri and Boulders Mining in Song River at Khasra no 226 घ & Khasra No. 229, Village- Ghisarpadi (Song-II), Tehsil- Doiwala & District- Dehradun, State- Uttarakhand (Area- 1.05 Ha) is an approved mining project in Ghisarpari, Dehradun, Uttarakhand. The site covers 2.6 acres.
Who is building it?
The applicant is Akshat Shah.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Sept 2025), as of 27 Nov 2026.
Where is it?
In Ghisarpari, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹55 lakh and a site of 2.6 acres.
When was it filed?
The application was filed on 1 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Sept 2025 |
| Application filed | 1 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Akshat Shah |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Ghisarpari |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site area on record |
| Our reference | WID-UK-00627 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Sept 2025 (this page) | Environmental approval granted | 2.6 acres | ₹55 lakh |
| New project filed 31 Jul 2024 | More information requested | 2.6 acres | ₹55 lakh |
| Early planning filed 3 Jul 2024 | Cleared for impact study | 2.6 acres | ₹55 lakh |
In context
96 applications in Dehradun since January 2022 are in the same category (Mining): 65 approved, 23 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.6 acres, this one is smaller than 85% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 5.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Ghisarpari, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 0.90… — under wildlife review, 0 m away
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.05… — under wildlife review, 0 m away
- Song-II Sand, Bajri and Boulders Mining in Song River at Khasra no 226 घ &… — more information requested, 0 m away
- Song-II Sand, Bajri and Boulders Mining in Song River at Khasra no 226 घ &… — cleared for impact study, 0 m away
- Song-III Sand, Bajri and Boulders Mining in Song River At Khasra No. 226 &… — environmental approval granted, 350 m away
- Song-III Sand, Bajri and Boulders Mining in Song River" At Khasra No. 226 &… — under wildlife review, 350 m away
- Song-III Sand, Bajri and Boulders Mining in Song River At Khasra No. 226 &… — more information requested, 350 m away
- Song-III Sand, Bajri and Boulders Mining in Song River At Khasra No. 226 &… — cleared for impact study, 350 m away
More from Akshat Shah in Dehradun
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 0.90… — under wildlife review
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.05… — under wildlife review
- Song-V Sand, Bajri and Boulders Mining in Song River At Khasra no 226 Gha &… — more information requested
- Song-V Sand, Bajri and Boulders Mining in Song River At Khasra no 226 घ &… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.