Proposed Project Dhakrani Sand Bajri & Boulders Mining at Yamuna River is is a proposed mining project in Dhakrani, Vikas Nagar, Dehradun, Uttarakhand. The site covers 1.8 acres.
Who is building it?
The applicant is Sameer khan.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Oct 2025), as of 27 Nov 2026.
Where is it?
In Dhakrani, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹10 lakh and a site of 1.8 acres.
When was it filed?
The application was filed on 13 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project Dhakrani Sand Bajri & Boulders Mining at Yamuna River is
Project details
| Official title | Proposed Project Dhakrani Sand Bajri & Boulders Mining at Yamuna River is located at Village- Dhakrani, Tehsil- Vikasnagar, District- Dehradun, Uttarakhand, Project Area:-0.7200 Ha. Lease Was Granted in Favour of M/s Galaxy Gateway Pro. Sh. Sameer Khan, |
|---|---|
| Status | Cleared for impact study |
| Status since | 2 Oct 2025 |
| Application filed | 13 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sameer khan |
| Land area | 1.8 acres (0.7 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Dhakrani |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00679 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Sept 2025 | More information requested | 1.8 acres | ₹10 lakh |
| Early planning filed 13 Sept 2025 (this page) | Cleared for impact study | 1.8 acres | ₹10 lakh |
In context
96 applications in Dehradun since January 2022 are in the same category (Mining): 65 approved, 23 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.8 acres, this one is smaller than 93% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 3.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Dhakrani, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project Dhakrani Sand Bajri & Boulders Mining at Yamuna River is — more information requested, 0 m away
- River bed Mining Project Dhakrani Bipin Thapliyal — application filed, 250 m away
- Building project by M/S Satyam Shivam Sundram II — environmental approval granted, 550 m away
- Environmental Clearance for Proposed 200 TPH Stone Crusher Plant by M/s Ray… — environmental approval granted, 750 m away
- Proposed 200 TPH Stone Crusher Plant at Khasra No. 32Mi0, 33,34, over an area… — environmental approval granted, 750 m away
- Environmental Clearance for Proposed 200 TPH Stone Crusher Plant — environmental approval granted, 750 m away
- - Proposed 200 TPH Stone Crusher Plant over an area of 1.3580 Ha by M/s Sri… — environmental approval granted, 800 m away
- - Proposed 100 TPH Stone Crusher Plant over an area of 0.8066 Ha. at Khasra… — environmental approval granted, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.