Quick answers
What is this project?
Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 0.281 Ha from a part of Saryu River Bed by Sh. Ajay Singh Mahar S/o Sh. Diwan Singh Mahar is an approved mining project in Baitta, Barakot, Champawat, Uttarakhand. The site covers 0.7 acres.
Who is building it?
The applicant is Ajay Singh Mahar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Sept 2025), as of 27 Nov 2026.
Where is it?
In Baitta, Barakot, Champawat, Uttarakhand.
How big is it?
It has a stated cost of ₹4 lakh and a site of 0.7 acres.
When was it filed?
The application was filed on 12 Aug 2025.
Project details
| Official title | Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 0.281 Ha from a part of Saryu River Bed at Village: Jakh Lagga Suteda, Teh: Barakot, Dist: Champawat, State- Uttarakhand by Sh. Ajay Singh Mahar S/o Sh. Diwan Singh Mahar |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 Sept 2025 |
| Application filed | 12 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ajay Singh Mahar |
| Land area | 2,800 m² |
| Project cost | ₹4 lakh |
| Village / locality | Baitta |
| Taluk / tehsil | Barakot |
| District | Champawat |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00689 |
In context
24 applications in Champawat since January 2022 are in the same category (Mining): 17 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.7 acres, this one is smaller than 92% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 1.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Baitta, Barakot, Champawat, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Bajri and Boulder mine in Ramganga River khasra Nos. 10525, Area- 0.480… — environmental approval granted, 200 m away
- Proposed RBM mining project over an area of 0.560 Ha on the Saryu Riverbed by… — environmental approval granted, 900 m away
- Patal to Sheel Bruyuri — more information requested, 3 km away
- OFC Bharat Net Project — initial checks, 3 km away
- Construction of Drinking Water Supply scheme for Lohaghat Town — under forest review, 5 km away
- Sand, Bajri and Boulder mine in Saryu River khasra Nos. 1193, 1966, Area-… — environmental approval granted, 5.4 km away
- Construction of Suteda to Sheel Motor Road — lapsed, 6.3 km away
- Barakot Block Office To Fartola Motor Road — under forest review, 6.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.