Quick answers
What is Sand, Bajri & Boulder (RBM) Deposit (Area 2.100Ha)?
Sand, Bajri & Boulder (RBM) Deposit (Area 2.100Ha) is a lapsed mining project in Patoti, Bajpur, Udham Singh Nagar, Uttarakhand. The site covers 5.2 acres.
Who is building it?
The applicant is Karan Goyal.
Has it been approved?
No. The application was lapsed on 19 Feb 2026, so it is no longer under consideration.
Where is it?
In Patoti, Bajpur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹70 lakh and a site of 5.2 acres.
When was it filed?
The application was filed on 8 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand, Bajri & Boulder (RBM) Deposit (Area 2.100Ha)
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Feb 2026 |
| Application filed | 8 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Karan Goyal |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Patoti |
| Taluk / tehsil | Bajpur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00749 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 8 Dec 2025 (this page) | Lapsed | 5.2 acres | ₹70 lakh |
| New project filed 23 Sept 2025 | Environmental approval granted | 5.2 acres | ₹70 lakh |
In context
96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 5.2 acres, this one is larger than 57% of them.
12 other mining leases have applied within 500 m of this site; together with this one they cover 49.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 29 mining leases have applied within 5 km.
Where it is
Patoti, Bajpur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Bajri & Boulder (RBM) Deposit (Area 2.100Ha) — environmental approval granted, 0 m away
- Sand, Bajri & Boulder (Rbm) Deposit in River Kosi — environmental approval granted, 150 m away
- Proposed sand, bajri & boulders Mine (Area = 1.403 ha) at Vill. –Patauti,… — environmental approval granted, 200 m away
- Proposed sand, bajri & boulders Mine (Area = 1.403 ha) at Vill. –Patauti,… — withdrawn, 200 m away
- Proposed Sand, Boulder & Bajri Mining Project in Khasra no. 3/25 & 3/26… — environmental approval granted, 250 m away
- Sand, Bajri & Boulder (RBM) Deposit at River bed of Kosi River (Area: 2.023 Ha) — initial checks, 250 m away
- Sand, Bajri & Boulder (RBM) Deposit at River bed of Kosi River (Area: 2.023 Ha) — environmental approval granted, 250 m away
- Proposed sand, bajri & boulders Mine (Area = 1.976 ha) at Vill. -Patauti,… — environmental approval granted, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.