Quick answers
What is this project?
Sand, Bajri & Boulder (RBM) Deposit at River bed of Kosi River (Area 1.093Ha) is an approved mining project in Mandia Guljari, Bajpur, Udham Singh Nagar, Uttarakhand. The site covers 2.7 acres.
Who is building it?
The applicant is Ashok Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Oct 2025), as of 27 Nov 2026.
Where is it?
In Mandia Guljari, Bajpur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹90 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 23 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Oct 2025 |
| Application filed | 23 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashok Kumar |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Mandia Guljari |
| Taluk / tehsil | Bajpur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00767 |
In context
96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 2.7 acres, this one is smaller than 75% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 14.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 32 mining leases have applied within 5 km.
Where it is
Mandia Guljari, Bajpur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Bajri & Boulder (RBM) Deposit Area 1.029Ha — environmental approval granted, 200 m away
- Noorpur Sand, Bajri & Boulder (RBM) Deposit — initial checks, 300 m away
- Sultanpur Sand, Bajri & Boulder (RBM) Mining Project — environmental approval granted, 350 m away
- Sultanpur Sand, Bajri & Boulder (RBM) Mining Project — lapsed, 450 m away
- "Sand, Bajri and Boulders Mining at Kosi River" At Khata No.- 414 Khasra no.… — environmental approval granted, 550 m away
- Proposed sand, bajri & boulders Mine (Area = 1.0 ha) at Vill.- Sultanpur,… — environmental approval granted, 800 m away
- Proposed sand, bajri & boulders Mine (Area = 1.0 ha) at Vill.- Sultanpur,… — withdrawn, 800 m away
- Noorpur Sand, Bajri & Boulder (RBM) Mining Project — initial checks, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.