Quick answers
What is this project?
Proposed Meravarana Sand, Bajri and Boulders Mining in Kailash River by Shri Rajesh Sharma is located at Khasra No. 38 & 41, Village- Meravarana, Tehsil- Sitarganj & District- Udham Singh Nagar, State- Uttarakhand (Area- 6.727 Ha.) is a proposed mining project in Maira Barahrana, Sitarganj, Udham Singh Nagar, Uttarakhand. The site covers 16.6 acres.
Who is building it?
The applicant is Rajesh Sharma.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Jun 2025), as of 27 Nov 2026.
Where is it?
In Maira Barahrana, Sitarganj, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 16.6 acres.
When was it filed?
The application was filed on 26 Apr 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Meravarana Sand, Bajri and Boulders Mining in Kailash River by Shri Rajesh…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Jun 2025 |
| Application filed | 26 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rajesh Sharma |
| Land area | 16.6 acres (6.7 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Maira Barahrana |
| Taluk / tehsil | Sitarganj |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00827 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Sept 2025 | Environmental approval granted | 16.6 acres | ₹1.3 crore |
| Early planning filed 26 Apr 2025 (this page) | Cleared for impact study | 16.6 acres | ₹1.3 crore |
In context
96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 16.6 acres, this one is larger than 94% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 78.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Maira Barahrana, Sitarganj, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Meravarana Sand, Bajri and Boulders Mining in Kailash River by Shri… — environmental approval granted, 0 m away
- Meravarana Sand, Bajri & Boulder Mining Project on Kailash River, Khasra No.… — environmental approval granted, 0 m away
- Proposed Ukrauli & Meravarana Sand, Bajri and Boulders Mining in Kailash River… — environmental approval granted, 450 m away
- Proposed Ukrauli & Meravarana Sand, Bajri and Boulders Mining in Kailash River… — cleared for impact study, 450 m away
- Sand, Bajri & Boulder Mining Project on Kailash River -Gata No. 38, 40, 41,… — environmental approval granted, 500 m away
- Environmental Clearance for Enhancement in Production Capacity Without… — environmental approval granted, 550 m away
- Amendment in Existing Environmental Clearance for API manufacturing of M/s… — environmental approval granted, 1000 m away
- Proposed Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No… — under environmental review, 1.2 km away
More from Rajesh Sharma in Udham Singh Nagar
- Meravarana Sand, Bajri & Boulder Mining Project on Kailash River, Khasra No.… — environmental approval granted