Quick answers
What is this project?
Proposed Sand, Bajri and Boulders Mining at Gaula River Khasra No. 287 & 288/2, Village- Dhadha, Tehsil- Kichha & District- Udham Singh Nagar, State- Uttarakhand Shri Ishwar Singh Area: 1.0 Ha is an approved mining project in Dhadha, Kichha, Udham Singh Nagar, Uttarakhand. The site covers 2.5 acres.
Who is building it?
The applicant is Ishwar Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Oct 2025), as of 27 Nov 2026.
Where is it?
In Dhadha, Kichha, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹9 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 16 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Oct 2025 |
| Application filed | 16 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ishwar Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹9 lakh |
| Village / locality | Dhadha |
| Taluk / tehsil | Kichha |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00837 |
In context
96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 2.5 acres, this one is smaller than 85% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Dhadha, Kichha, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dhirendra Kumar — environmental approval granted, 600 m away
- Dhadha Sand, Bajri and Boulders Mining at Gaula River by M/s Kailash River bed… — environmental approval granted, 800 m away
- Proposed Bandiya Sand, Bajri and Boulders Mining at Gaula River by M/s Kailash… — environmental approval granted, 3.4 km away
- Laxmipur-5 Sand, Bajri and Boulders Mining (RBM) at Gola River U.S Nagar — environmental approval granted, 3.9 km away
- Gangoli Laxmipur Sand, Bajri and Boulders Mining in Gola River at khasra no.… — environmental approval granted, 3.9 km away
- Laximpur Sand, Bajri & Boulder Mining Project — initial checks, 4.4 km away
- Laximpur Sand, Bajri & Boulder Mining Project — cleared for impact study, 4.4 km away
- Satellite Centre Comprising of 280 Bedded Multispecialty Hospital, Sr Hostel,… — environmental approval granted, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.