What is Developing? Open the mapMap

Environmental approval grantedMining · Udham Singh Nagar, Uttarakhand

Proposed Sand, Bajri and Boulders Mining at Gaula River Khasra No. 287 & 288/2, Village- Dhadha, Tehsil- Kichha & District- Udham Singh Nagar, State- Uttarakhand Shri Ishwar Singh Area: 1.0 Ha

Proposed Sand, Bajri and Boulders Mining at Gaula River Khasra No. 287 & 288/2, Village- Dhadha, Tehsil- Kichha & District- Udham Singh Nagar, State- Uttarakhand Shri Ishwar Singh Area: 1.0 Ha is an approved mining project in Dhadha, Kichha, Udham Singh Nagar, Uttarakhand. The site covers 2.5 acres. Its stated project cost is ₹9 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Oct 2025).

See it on the live map All projects in Udham Singh Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand, Bajri and Boulders Mining at Gaula River Khasra No. 287 & 288/2, Village- Dhadha, Tehsil- Kichha & District- Udham Singh Nagar, State- Uttarakhand Shri Ishwar Singh Area: 1.0 Ha is an approved mining project in Dhadha, Kichha, Udham Singh Nagar, Uttarakhand. The site covers 2.5 acres.

Who is building it?

The applicant is Ishwar Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 1 Oct 2025), as of 27 Nov 2026.

Where is it?

In Dhadha, Kichha, Udham Singh Nagar, Uttarakhand.

How big is it?

It has a stated cost of ₹9 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 16 Sept 2025.

Project details

StatusEnvironmental approval granted
Status since1 Oct 2025
Application filed16 Sept 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantIshwar Singh
Land area2.5 acres (1 ha)
Project cost₹9 lakh
Village / localityDhadha
Taluk / tehsilKichha
DistrictUdham Singh Nagar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00837

In context

96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 2.5 acres, this one is smaller than 85% of them.

No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.

Where it is

Dhadha, Kichha, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.