Quick answers
What is this project?
Proposed mining of RBM(Sand, Bajri and Boulders) project over an area of 0.420 Ha from the bed of river Ladhiya by Shri Raghuvar Singh Adhikari S/o Sh. Indra Singh Adhikari is a proposed mining project in Bakora, Champawat, Uttarakhand. The site covers 1 acre.
Who is building it?
The applicant is Raghuvar Singh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bakora, Champawat, Uttarakhand.
How big is it?
It has a stated cost of ₹4 lakh and a site of 1 acre.
When was it filed?
The application was filed on 21 Sept 2026.
Project details
| Official title | Proposed mining of RBM(Sand, Bajri and Boulders) project over an area of 0.420 Ha from the bed of river Ladhiya, in village- Mosta Bakoda, Tehsil & District- Champawat, State- Uttarakhand by Shri Raghuvar Singh Adhikari S/o Sh. Indra Singh Adhikari |
|---|---|
| Status | More information requested |
| Status since | 13 Nov 2026 |
| Application filed | 21 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raghuvar Singh |
| Land area | 1 acres (0.4 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Bakora |
| Taluk / tehsil | Champawat |
| District | Champawat |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00867 |
In context
24 applications in Champawat since January 2022 are in the same category (Mining): 17 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1 acre, this one is smaller than 87% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Bakora, Champawat, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mosta RBM Mining Project, Village-Mosta , Tehsil & District- Champawat,… — environmental approval granted, 1.6 km away
- Chuka-Kharayat-Kot Kendri-Khirdwaari to Gangseer Motor Road, Under PMGSY IV — under forest review, 2 km away
- 4G Mobile Tower Installation under Government of India 4G Saturation Project — forest land use approved, 2.2 km away
- 4G Tower under Government of India 4 Saturation Project at Near Poornagiri… — forest land use approved, 2.2 km away
- 4G Tower under Government of India 4 Saturation Project at Near Poornagiri… — lapsed, 2.2 km away
- Construction of Munch to Bakora Motor Road under PMGSY IV — more information requested, 2.6 km away
- M/s LSC Infratech Ltd. Sand Bajri Boulder Mining Project in Ladhiya River — environmental approval granted, 4 km away
- Tanakpur-Jauljibi MR to Sorai-Hartola Motor Road under PMGSY IV — under forest review, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.