Quick answers
What is this project?
Environmental Clearance for the Proposed Hotel, Resort & Residential Villa Building Project of M/s Orsmac Consultants Pvt. Ltd. at Landour, Mussoorie, Dehradun, Uttarakhand with total built up area – 37510.45 Sq. m is a proposed building project in Nagar Palika Mussoorie, Dehradun, Uttarakhand. The site covers 11.3 acres.
Who is building it?
The applicant is Orsmac Consultants PVT LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Nagar Palika Mussoorie, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹250 crore and a site of 11.3 acres.
When was it filed?
The application was filed on 17 Sept 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for the Proposed Hotel, Resort & Residential Villa Building…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 28 Sept 2026 |
| Application filed | 17 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Orsmac Consultants PVT LTD |
| Land area | 11.3 acres (4.6 ha) |
| Project cost | ₹250 crore |
| Village / locality | Nagar Palika Mussoorie |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00880 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Sept 2026 | Under environmental review | 11.3 acres | ₹250 crore |
| New project filed 17 Sept 2026 (this page) | Under environmental review | 11.3 acres | ₹250 crore |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.3 acres, this one is larger than 87% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nagar Palika Mussoorie, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for the Proposed Hotel, Resort & Residential Villa… — under environmental review, 0 m away
- Seeking for prior approval of the Central Govt. under Section 2 (1) of the VAn… — lapsed, 1.4 km away
- जनपद देहरादून मसूरी नगर पालिका क्षेत्रान्तर्गत निजी वन घोषित मैरी विले स्टेट… — lapsed, 1.4 km away
- Seeking for Prior Approval of the Central Govt. Under Section 2 (1) of the Van… — lapsed, 1.4 km away
- Mussoorie Sewerage Scheme(Camel back Zone STP) — lapsed, 2.1 km away
- Rural road up to Sheetala Mata Temple Barloganj — not approved, 2.3 km away
- Environmental Clearance for Proposed Installation of DG Sets for Aerial… — environmental approval granted, 2.6 km away
- Multi Story Parking of Mussoorie Dehradun Development Authority at Srinagar… — in-principle approval, conditions pending, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.