Quick answers
What is this project?
Proposed mining of RBM (Sand, Bajri and Boulders) project over an area of 0.286 Ha from the bed of river Ladhiya by Shri Basant Ballabh S/o Sh. Durga Datt is a proposed mining project in Dughauri, Poornagiri, Champawat, Uttarakhand. The site covers 0.4 acres.
Who is building it?
The applicant is Basant Ballabh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Dughauri, Poornagiri, Champawat, Uttarakhand.
How big is it?
It has a stated cost of ₹3 lakh and a site of 0.4 acres.
When was it filed?
The application was filed on 22 Sept 2026.
Project details
| Official title | Proposed mining of RBM (Sand, Bajri and Boulders) project over an area of 0.286 Ha from the bed of river Ladhiya, in village- Dudhauri, Tehsil & District- Champawat, State- Uttarakhand by Shri Basant Ballabh S/o Sh. Durga Datt |
|---|---|
| Status | More information requested |
| Status since | 13 Nov 2026 |
| Application filed | 22 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Basant Ballabh |
| Land area | 1,600 m² |
| Project cost | ₹3 lakh |
| Village / locality | Dughauri |
| Taluk / tehsil | Poornagiri |
| District | Champawat |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00895 |
In context
24 applications in Champawat since January 2022 are in the same category (Mining): 17 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.4 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Dughauri, Poornagiri, Champawat, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project: Proposed Diyuri-3 Sand, Bajri and Boulders Mining in Ladhiya River… — environmental approval granted, 1.1 km away
- Project: Proposed Diyuri-3 Sand, Bajri and Boulders Mining in Ladhiya River… — cleared for impact study, 1.1 km away
- Proposed Sand, Bajri, Boulder Mining project over an area of 2.17 ha by Shri… — environmental approval granted, 1.8 km away
- Proposed Sand, Bajri, Boulder Mining project over an area of 1.36 ha by Shri… — environmental approval granted, 1.9 km away
- Diyuri-4 Sand, Bajri & Boulder Mining Project. — initial checks, 2.1 km away
- Diyuri-4 Sand, Bajri & Boulder Mining Project. — cleared for impact study, 2.1 km away
- OFC Bharat Net Project — lapsed, 2.1 km away
- OFC Bharat Net Project — more information requested, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.