Quick answers
What is Mobile Tower Installation at Khankra Village?
Mobile Tower Installation at Khankra Village is a lapsed telecom project in Khankra, Rudraprayag, Uttarakhand. The site covers 2.2 acres.
Who is building it?
The applicant is Indus Towers LTD.
Has it been approved?
No. The application was lapsed on 29 Apr 2025, so it is no longer under consideration.
Where is it?
In Khankra, Rudraprayag, Uttarakhand.
How big is it?
It has a stated cost of ₹10 lakh; a site of 2.2 acres and 250 m² of forest land.
When was it filed?
The application was filed on 22 Oct 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mobile Tower Installation at Khankra Village
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Apr 2025 |
| Application filed | 22 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers LTD |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 250 m² |
| Project cost | ₹10 lakh |
| Village / locality | Khankra |
| Taluk / tehsil | Rudraprayag |
| District | Rudraprayag |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01067 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Jan 2025 | Lapsed | 2.2 acres | ₹10 lakh |
| New project filed 22 Oct 2024 (this page) | Lapsed | 2.2 acres | ₹10 lakh |
In context
8 applications in Rudraprayag since January 2022 are in the same category (Telecom): 0 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khankra, Rudraprayag, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mobile Tower Installation at Khankra Village — lapsed, 0 m away
- :- 1. Automated Driving Testing Track 2. Traffic Awareness Centre and 3.… — under forest review, 950 m away
- :- 1. Automated Driving Testing Track 2. Traffic Awareness Centre and 3.… — lapsed, 950 m away
- Sand, Bajri And Boulders Mine in Alaknanda River, Khasra No 53 & 01, Area:… — environmental approval granted, 3.3 km away
- Trunching Ground Rudraprayag — lapsed, 3.4 km away
- Nawasu Kherakhal G.O.V. Pumping Water Supply Scheme — lapsed, 4.7 km away
- Nawasu Kherakhal G.O.V. Pumping Water Supply Scheme — lapsed, 4.7 km away
- Transfer of Forest Land for Additional Muck Dumping Site for Disposal of… — not approved, 5.3 km away
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.