Quick answers
What is Bernigad Small Hydro Electric Project?
Bernigad Small Hydro Electric Project is a proposed water and irrigation project in Meghar, Chakrata, Dehradun, Uttarakhand. The site covers 30 acres.
Who is building it?
The applicant is Barnigad Krr Power Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Meghar, Chakrata, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹320.3 crore; a site of 30 acres and 30 acres (12.2 ha) of forest land.
When was it filed?
The application was filed on 11 Mar 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 24 Aug 2026 |
| Application filed | 11 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Barnigad Krr Power Private Limited |
| Land area | 30 acres (12.2 ha) |
| Forest land | 30 acres (12.2 ha) |
| Project cost | ₹320.3 crore |
| Village / locality | Meghar |
| Taluk / tehsil | Chakrata |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01269 |
In context
16 applications in Dehradun since January 2022 are in the same category (Water & irrigation): 5 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2.8 years from filing to approval. At 30 acres, this one is larger than 75% of them.
Where it is
Meghar, Chakrata, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Lavadi (Gadsar) Water Supply Scheme — more information requested, 9.5 km away
- Lavadi Goh Water Supply Scheme — lapsed, 9.5 km away
- Missing Link Motor Road with bridge of Makhti Kanknoi Motor Road — under forest review, 12.1 km away
- Construction/Extension of Purodi-Hayo-Tangri Motor Road upto Kandidhar (Old Dau) — under forest review, 12.6 km away
- Kokti-Marlau- Budoda Motor Road in Block Chakrata, District Dehradun — under forest review, 14.5 km away
- Dungri Penuwa Water Supply Scheme — more information requested, 21.4 km away
- Construction Of Village Luhan to Bhadraj mandir (Danda) — lapsed, 21.6 km away
- Construction of Village Luhan to Bhadraj mandir (Danda) — initial checks, 22.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.