Project details
| Status | Initial checks |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 15 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Temporary Division Public Works Department Gauchar |
| Land area | 27.1 acres (11 ha) |
| Forest land | 7.2 acres (2.9 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Bansoli |
| Taluk / tehsil | Karnaprayag |
| District | Chamoli |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01304 |
In context
79 applications in Chamoli since January 2022 are in the same category (Roads & highways): 2 approved, 52 filed or under review, and 25 withdrawn, lapsed or rejected. At 27.1 acres, this one is smaller than 57% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bansoli, Karnaprayag, Chamoli, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Matholi Sand, Boulders and Bajri (RBM) Mining in Pindar River — environmental approval granted, 2.7 km away
- Kanda Maikura Pumping Water Supply scheme — more information requested, 5.7 km away
- Under State Sector Construction of Double Lane Class a Loading Bridge in 30… — lapsed, 5.8 km away
- 66 KV D/C Line for LILO of 66 KV Karanprayag - Kothiyalsain Line at 132 KV… — more information requested, 5.8 km away
- Sonala - Bhatiyana - Sainj - Khetoli Motor road (Length-3.00 Km.) — in-principle approval, conditions pending, 5.9 km away
- Environmental Clearance for Sanitary Landfill — under environmental review, 6.3 km away
- Environmental Clearance for Sanitary Landfill — cleared for impact study, 6.3 km away
- 132 KV Overhead Transmission Line for Proposed Tss of Rail Vikas Nigam… — forest land use approved, 6.6 km away
More from Temporary Division Public Works Department Gauchar in Chamoli
- Under State Sector Construction of Double Lane Class a Loading Bridge in 16… — initial checks
- Motor Road From Ujjwalpur-Top to Village Thaldhar Kumkhodi — initial checks
- Under State Sector Construction of Double Lane Class a Loading Bridge in 30… — lapsed
- Under State Sector Construction of Double Lane Class a Loading Bridge in 30… — lapsed
- Khet Gadera to Burakholi Keda Pandav Motor road — under forest review
- Adibadri Nauti Motor Road to Nagali to Ishwarikhal Motor Road — under forest review