What is Developing? Open the mapMap

LapsedRoads & highways · Pithoragarh, Uttarakhand

New construction of Foot Bridge at Bhujagaad River in 70m span at Munsyari

New construction of Foot Bridge at Bhujagaad River in 70m span at Munsyari is a lapsed road project in Selmali, Munsiari, Pithoragarh, Uttarakhand. The site covers 0.2 acres. Its stated project cost is ₹1.7 crore. As of 27 Nov 2026, its status is “Lapsed” (since 23 Sept 2026).

See it on the live map All projects in Pithoragarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since23 Sept 2026
Application filed19 Nov 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantPublic Work Department
Land area1,000 m²
Forest land400 m²
Project cost₹1.7 crore
Village / localitySelmali
Taluk / tehsilMunsiari
DistrictPithoragarh
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-01420

In context

58 applications in Pithoragarh since January 2022 are in the same category (Roads & highways): 0 approved, 37 filed or under review, and 21 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 100% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Selmali, Munsiari, Pithoragarh, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Public Work Department in Pithoragarh

24 Public Work Department, Uttarakhand projects in Pithoragarh
All 135 Public Work Department, Uttarakhand projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.