Project details
| Status | More information requested |
|---|---|
| Status since | 21 Nov 2026 |
| Application filed | 3 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Ujspurola@gmail.Com |
| Land area | 500 m² |
| Forest land | 480 m² |
| Project cost | ₹1 crore |
| Village / locality | Thali |
| Taluk / tehsil | Puraula |
| District | Uttarkashi |
| State | Uttarakhand |
| Location from | Site area on record |
| Our reference | WID-UK-01551 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Dec 2024 (this page) | More information requested | 0.1 acres | ₹1 crore |
| New project filed 17 Jun 2024 | Lapsed | 0.1 acres | ₹1 crore |
In context
116 applications in Uttarkashi since January 2022 are in the same category (Water & irrigation): 2 approved, 50 filed or under review, and 64 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 82% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thali, Puraula, Uttarkashi, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thali Water Supply Scheme — lapsed, 50 m away
- Thali Water Supply Scheme — lapsed, 100 m away
- Drinking Water Supply Kotiyalgaon Water Supply Scheme Under Jal Jeevan Mission… — lapsed, 2.7 km away
- Constructions of Kisari Khadd to Sapeta Kund Ambedkar, Kwadi Motor Road Distt… — lapsed, 3.2 km away
- Proposed RBM (Sand Bajri Boulder) mining Project on the Yamuna riverbed by M/s… — environmental approval granted, 3.5 km away
- Kansola Water Supply Scheme Under Jal Jeevan Mission Project — lapsed, 3.6 km away
- Solid Waste Management and Disposal Facility of 5 TPD Capacity by Nagar… — withdrawn, 3.7 km away
- Municipal Solid Waste Management and Disposal Facility of 5 TPD Capacity By… — cleared for impact study, 3.9 km away
More from Ujspurola@gmail.Com in Uttarkashi
- Construction Work of Drinking Water Scheme in Naitwar Under Jal Jeevan Mission… — more information requested
- Koti Dhampur Water Supply Scheme — lapsed
- Bari Water Supply Scheme Under Jal Jeevan Mission Project — more information requested
- Sankri Water Supply Scheme Under Jal Jeevan Mission Prtoject — more information requested
- Kotgaon Water Supply Scheme Under Jal Jeevan Mission Project — more information requested
- Makudi Water Supply Scheme Under Jal Jeevan Mission Project — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.