Quick answers
What is Khatt Bagi Moriyana Pumping Water Supply Scheme?
Khatt Bagi Moriyana Pumping Water Supply Scheme is a lapsed water and irrigation project in Khatt, Dhanaulti, Tehri Garhwal, Uttarakhand. The site covers 1 acre.
Who is building it?
The applicant is Uttarakhand Peyjal Sansadhan Vikas Evam Nirman Nigam.
Has it been approved?
No. The application was lapsed on 5 Mar 2024, so it is no longer under consideration.
Where is it?
In Khatt, Dhanaulti, Tehri Garhwal, Uttarakhand.
How big is it?
It has a stated cost of ₹3.4 crore; a site of 1 acre and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 26 Aug 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Mar 2024 |
| Application filed | 26 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Uttarakhand Peyjal Sansadhan Vikas Evam Nirman Nigam |
| Land area | 1 acres (0.4 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹3.4 crore |
| Village / locality | Khatt |
| Taluk / tehsil | Dhanaulti |
| District | Tehri Garhwal |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01839 |
In context
17 applications in Tehri Garhwal since January 2022 are in the same category (Water & irrigation): 0 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. At 1 acre, this one is smaller than 71% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khatt, Dhanaulti, Tehri Garhwal, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laluri Ghiyakoti Kyarda ki Challi Mising Link Motor Road — forest land use approved, 2.8 km away
- अगिण्डा पेयजल योजना by Uttarakhand Payjal Sansadhan Vikas Avam Nirman Nigam — more information requested, 2.8 km away
- Under the State Plan, Construction Work of One and Half Lane Class 'a' Loading… — in-principle approval, conditions pending, 3 km away
- Row Permission for Laying Optical fiber Cable from Nagun to Moriyana Top… — lapsed, 4.4 km away
- Under the State Plan, Construction Work of One and Half Lane Class 'a' Loading… — in-principle approval, conditions pending, 5.1 km away
- 1-Construction from Bagi to Khad Motor Road at Maindkhal-Khad Sabli (Jaunpur)… — under forest review, 5.1 km away
- Under the State Plan, Construction Work of One and Half Lane Class 'a' Loading… — in-principle approval, conditions pending, 5.1 km away
- Under the State Plan, Construction Work of One and Half Lane Class 'a' Loading… — in-principle approval, conditions pending, 5.5 km away
More from Uttarakhand Peyjal Sansadhan Vikas Evam Nirman Nigam in Tehri Garhwal
- Gaja Drinking Water Supply Scheme (Amrit 2.0) in Tehri Garhwal — more information requested
- Bhunyasari Water Supply Scheme — lapsed
- Munikireti Pumping Drinking Water Supply Scheme (Amrit-2.0) in Muncipal… — lapsed
- काण्डी ग्राम समूह पम्पिंग पेयजल योजना by Uttarakhand Peyjal Sansadhan Vikas… — more information requested
- Bhunyasari Water Supply Scheme — lapsed
6 Uttarakhand Peyjal Sansadhan Vikas Evam Nirman Nigam projects in Tehri Garhwal
All 12 Uttarakhand Peyjal Sansadhan Vikas Evam Nirman Nigam projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.