Quick answers
What is this project?
Forest Land Diversion Case Of 0.0281 Hect. Land At Byura For Construction Of Water Supply Scheme Under ADB Assisted Haldwani Project(IUIDH) by UUSDA is a proposed water and irrigation project in R F, Nainital, Uttarakhand. The site covers 0.1 acres.
Who is building it?
The applicant is Uttarakhand Urban Sector Development Agency.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In R F, Nainital, Uttarakhand.
How big is it?
It has a stated cost of ₹1 lakh; a site of 0.1 acres and 280 m² of forest land.
When was it filed?
The application was filed on 3 May 2023.
Project details
| Official title | Forest Land Diversion Case Of 0.0281 Hect. Land At Byura For Construction Of Water Supply Scheme Under ADB Assisted Haldwani Project(IUIDH) by UUSDA At Haldwani District Nainital,Uttarakhand |
|---|---|
| Status | More information requested |
| Status since | 14 Apr 2026 |
| Application filed | 3 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Uttarakhand Urban Sector Development Agency |
| Land area | 300 m² |
| Forest land | 280 m² |
| Project cost | ₹1 lakh |
| Village / locality | R F |
| Taluk / tehsil | Nainital |
| District | Nainital |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01846 |
In context
18 applications in Nainital since January 2022 are in the same category (Water & irrigation): 1 approved, 14 filed or under review, and 3 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 94% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
R F, Nainital, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Administrative Office Building for State Bank of India — lapsed, 1.4 km away
- Reconstruction & Protection Work Of Gaulapar Pareller Canal In Haldwani Block — more information requested, 1.6 km away
- Reconstruction & Protection Work Of Gaulapar Pareller Canal In Haldwani Block — lapsed, 1.6 km away
- Alternate motor road of Kathgodam Hedakhan Simaliyaband Sanani band ,km 03 to… — not approved, 1.7 km away
- Alternate Road From Kathgodam -Hedakhan -Sannai Bend _ Semaliya Bend Motor… — lapsed, 1.8 km away
- 26 Mld Wtp and Other Appurtenant Works in Sheeshmahal Upper Under Source and… — more information requested, 1.8 km away
- Kathgodam to Ranibag Section Bypass Motor Road NH No. 87(109) and 90 M. Span… — lapsed, 1.8 km away
- Kathgodam to Ranibag Section Bypass Motor Road NH No. 87(109) and 90 M. Span… — forest land use approved, 1.8 km away
More from Uttarakhand Urban Sector Development Agency in Nainital
- परियोजना का नामः– जनपद नैनीताल के हल्द्वानी क्षेत्र में यू०यू०एस०डी०ए० द्वारा… — more information requested
- जनपद नैनीताल के हल्द्वानी क्षेत्र में एडीबी सहायतित हल्द्वानी परियोजना… — more information requested
- Administrative cum Bus Terminus Building at Nainital Road, Haldwani — environmental approval granted
- Forest Land Diversion Case of 0.224 Hect. Land for Development of Sewerage… — more information requested
- Forest Land Diversion Case of 0.0804 Hect. Land At Kumaon Colony For… — more information requested
- Forest Land Diversion Case of 0.1231 Hect. Land At Haldikhal For Construction… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.