Project details
| Status | Initial checks |
|---|---|
| Status since | 9 Oct 2026 |
| Application filed | 8 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Exicutive Engineer |
| Land area | 142.5 acres (57.7 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Gunukot |
| Taluk / tehsil | Bageshwar |
| District | Bageshwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01900 |
In context
39 applications in Bageshwar since January 2022 are in the same category (Roads & highways): 1 approved, 25 filed or under review, and 13 withdrawn, lapsed or rejected. At 142.5 acres, this one is larger than 86% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gunukot, Bageshwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kameri Pape Motor Road to Vilekh Motor Road — lapsed, 2.2 km away
- Road From Kamedi-Pape Motor Road to Vilekh Via Nail — lapsed, 2.4 km away
- Motor road from Gram Panchayat Selta to Joshikhola — under forest review, 2.5 km away
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 0.30… — under environmental review, 3.1 km away
- Mining project by M/s Agari Minerals Syunebad — cleared for impact study, 3.2 km away
- Khuldori Soapstone Deposit — cleared for impact study, 3.2 km away
- Bageshwar Nagar (Phase 2) Pumping Water Supply Scheme — lapsed, 4 km away
- KATHAYATWADA SAND, BAJRI AND BOULDERS MINING IN GOMTI RIVER" At KHASRA NO-1293… — environmental approval granted, 4.4 km away
More from Exicutive Engineer in Bageshwar
- Kausani-Jadapani-Bagari-Matkhal-Doba MR — initial checks
- Construction of Naugaon-Harumandir to Matiyoli MR — lapsed
- Kameri Pape Motor Road to Vilekh Motor Road — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.