Project details
| Status | More information requested |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 18 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Pwd |
| Land area | 400 m² |
| Forest land | 360 m² |
| Project cost | ₹4.6 crore |
| Village / locality | Rithakhal |
| Taluk / tehsil | Chaubatta Khal |
| District | Garhwal |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01987 |
In context
76 applications in Garhwal since January 2022 are in the same category (Roads & highways): 4 approved, 40 filed or under review, and 31 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 89% of them.
Where it is
Rithakhal, Chaubatta Khal, Garhwal, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Forest Land to Gpwd for New Construction of Rural Motor Road From… — in-principle approval, conditions pending, 5.2 km away
- Gheruva to Gujarkhand-Malana Motor Road in block Jaiharikhal of Constituency… — forest land use approved, 5.7 km away
- Gujarkhand G.O.V. pumping Water Supply Scheme — lapsed, 7.1 km away
- Row Permission for Laying Optical fiber Cable from Baijro Bridge to Gawani to… — lapsed, 8.7 km away
- Guileni-Tarkeshwar Motor Road of Constituency Choubattakhal, Distt. Pauri… — lapsed, 8.9 km away
- Barsund Devta G.O.V. Pumping Water Supply Scheme — more information requested, 9.3 km away
- Chmasudhar Sand, Bajri & Boulder (RBM) Mining Project — environmental approval granted, 9.7 km away
- Bijorapani - Naukholi motor road up to Pand Bhainsoda — more information requested, 10 km away
More from Pwd in Garhwal
- राज्य योजना के अन्तर्गत जनपद पौडी के विधानसभा क्षेत्र श्रीनगर के अन्तर्गत… — lapsed
- राज्य योजना के अन्तर्गत जनपद पौडी गढ़वाल के विधानसभा क्षेत्र चैबट्टाखाल के… — lapsed
- New construction work of motor road from Pokhra Baijro motor road to Diwan… — initial checks
- Construction Work of a 24-Meter Span Double-Lane Class 'a' Loading Bridge in… — more information requested
- Class 'A' Loading (1.5-lane) bridge, replacing the previously constructed… — lapsed
- Class 'a' Loading Bridge in Replacement of the Previously Constructed Class… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.