One of 2 filings for this project. The project's main page, with every filing and where each stands: Math Lagga Pilang RBM Mining Project, Village- Math Lagga Pilang, Tehsil- Chamoli,…
Project details
| Status | More information requested |
|---|---|
| Status since | 10 May 2024 |
| Application filed | 10 May 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Surya Prakash |
| Land area | 3,900 m² |
| Project cost | ₹4 lakh |
| Village / locality | Math (Balkihila) |
| Taluk / tehsil | Chamoli |
| District | Chamoli |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-02131 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 May 2026 | More information requested | 1 acre | ₹4 lakh |
| New project filed 10 May 2024 (this page) | More information requested | 1 acre | ₹4 lakh |
In context
6 applications in Chamoli since January 2022 are in the same category (Buildings & townships): 0 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Math (Balkihila), Chamoli, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Math Lagga Pilang RBM Mining Project, Village- Math Lagga Pilang, Tehsil-… — more information requested, 0 m away
- Siron-Sinji Motor Road From Balkhila. Under C/M Annowancement No 59/2021 — more information requested, 1.7 km away
- Proposed MSW Sanitary landfill facility for Nagar Palika Parishad,… — lapsed, 2.4 km away
- Proposed MSW Sanitary landfill facility for Nagar Palika Parishad,… — lapsed, 2.4 km away
- Construction of Link motor road From Gair Pul to Gairgaon — more information requested, 3.5 km away
- In Place of Constructed Class "b" Loading Bridge at Km 109 X.S. 108/7-8 and Km… — more information requested, 3.6 km away
- Construction of Link Motor road From Gair Pul to GairGaon — lapsed, 3.7 km away
- Construction of Link Motor road From Gair Pul to GairGaon — lapsed, 3.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.