What is Developing? Open the mapMap

Application filedRoads & highways · Pithoragarh, Uttarakhand

Diversion of Forest Land for Construction of Milam-Dung Road Between Km 0.00 to Km 11.064 (Approx Length 11.064 Km) Under Aor of 1447 Bcc/47 Brtf/Hirak in Uttarakhand State.

Diversion of Forest Land for Construction of Milam-Dung Road Between Km 0.00 to Km 11.064 (Approx Length 11.064 Km) Under Aor of 1447 Bcc/47 Brtf/Hirak in Uttarakhand State is a proposed road project in Milam, Munsiari, Pithoragarh, Uttarakhand. The site covers 66.3 acres. Its stated project cost is ₹101.3 crore. As of 27 Nov 2026, its status is “Application filed” (since 11 Jun 2026).

See it on the live map All projects in Pithoragarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusApplication filed
Status since11 Jun 2026
Application filed11 Jun 2026
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Defense
Land area66.3 acres (26.9 ha)
Project cost₹101.3 crore
Village / localityMilam
Taluk / tehsilMunsiari
DistrictPithoragarh
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-02268

In context

58 applications in Pithoragarh since January 2022 are in the same category (Roads & highways): 0 approved, 37 filed or under review, and 21 withdrawn, lapsed or rejected. At 66.3 acres, this one is larger than 60% of them.

Where it is

Milam, Munsiari, Pithoragarh, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Defense in Pithoragarh

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.