Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Jan 2023 |
| Application filed | 17 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mohit Niranjan |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Lakhanpura |
| Taluk / tehsil | Lalitpur |
| District | Lalitpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00018 |
In context
75 applications in Lalitpur since January 2022 are in the same category (Mining): 59 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.5 acres, this one is larger than 51% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 30.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 13 mining leases have applied within 5 km.
Where it is
Lakhanpura, Lalitpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Granite and Dolostone Ballast Gitti deposit, Gata 93/1, Khand No. 6 — environmental approval granted, 0 m away
- Granite and Dolostone Ballast Gitti Mining Project — under environmental review, 100 m away
- Building stone (Khanda-Boulder/Gitti-Ballast) Mine at Gata/Arazi No- 2/1,… — environmental approval granted, 300 m away
- Building stone (Khanda-Boulder/Gitti-Ballast) Mine at Gata/Arazi No- 2/1,… — cleared for impact study, 300 m away
- Environment Clearance for Khanda, Gitti, Mining at Gata No. 2/1, Khand-3,… — environmental approval granted, 300 m away
- "Building Stone (khanda-boulder/gitti-ballast)" Mine at Gata/Arazi No-02/1,… — environmental approval granted, 350 m away
- Granite and Dolostone Ballast Gitti Mining Project — cleared for impact study, 450 m away
- "Building stone (khanda-boulder/gitti-ballast)" Mine at Arazi No-02/1,… — environmental approval granted, 450 m away
More from Mohit Niranjan in Lalitpur
- Building stone (khanda-boulder/gitti-ballast)" Mine at Khand/Arazi No-931… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.