Quick answers
What is this project?
Sand mining (Private land) project at Gata no -640, Area 0.858 Ha Village- Laxmampur Lahsorwa, Tehsil- Nanpara, District Bahraich, U.P by Shri Omkar Nath Singh is an approved mining project in Lakshamanpur Lahsorwa, Nanpara, Bahraich, Uttar Pradesh. The site covers 2.1 acres.
Who is building it?
The applicant is Onkar Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Sept 2022), as of 27 Nov 2026.
Where is it?
In Lakshamanpur Lahsorwa, Nanpara, Bahraich, Uttar Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 2.1 acres.
When was it filed?
The application was filed on 29 Sept 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Sept 2022 |
| Application filed | 29 Sept 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Onkar Singh |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Lakshamanpur Lahsorwa |
| Taluk / tehsil | Nanpara |
| District | Bahraich |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00248 |
In context
20 applications in Bahraich since January 2022 are in the same category (Mining): 18 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.1 acres, this one is smaller than 60% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 5.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Lakshamanpur Lahsorwa, Nanpara, Bahraich, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mine" from Riverbed of Rapti River — environmental approval granted, 450 m away
- "Ordinary Earth Mine", Village- Khairahaniya, Gata No.- 31, 56, 93, 17, 42 &… — environmental approval granted, 10.4 km away
- "Ordinary Earth Mine", Village- Parsa Agaiya, Gata No.- 678 & 693, Lease Area-… — environmental approval granted, 20.3 km away
- "Ordinary Earth Mine" — environmental approval granted, 22.9 km away
- "Ordinary Earth Mine" — environmental approval granted, 26.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — lapsed, 26.8 km away
- Long Term Measures to Be Conducted on Black Spots As Identified by Morth on… — more information requested, 27.4 km away
- Nanpara Dehati Soil Mining Project — initial checks, 28 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.