Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 May 2023 |
| Application filed | 24 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | R K Transport and Constructions Limited |
| Land area | 14.8 acres (6 ha) |
| Project cost | ₹4.1 crore |
| Village / locality | Khewandha |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00295 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Feb 2024 | Lapsed | 14.8 acres | ₹4.1 crore |
| Early planning filed 24 May 2023 (this page) | Cleared for impact study | 14.8 acres | ₹4.1 crore |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 14.8 acres, this one is larger than 82% of them.
No other mining lease on record is within 500 m of this site; 30 have applied within 5 km.
Where it is
Khewandha, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Area- 6.0 Ha on Rihand River for Sand/Morrum Mining Project at Khand No. A,… — lapsed, 0 m away
- "Gitti, Boulders (Dolo Stone)" Project at Gata No.- 451Cha, Village- Bardiya,… — environmental approval granted, 1.7 km away
- "Gitti, Boulders (Dolo Stone)" Project at Gata No.- 451Cha, Village- Bardiya,… — cleared for impact study, 1.7 km away
- "Morrum Mining" from Riverbed of Renu/Rihand River — cleared for impact study, 1.7 km away
- Submission of Form-1, Pre Feasibility Report (PFR), EMP, and Approved Mining… — lapsed, 1.8 km away
- Proposed "Gitti/ Boulder (Dolostone)" Project at Gata No.- 257, Village-… — environmental approval granted, 1.8 km away
- Bardiya Gitti, Boulder (Dolo Stone) Mining Project (Area 1.2146 hectares) — lapsed, 1.9 km away
- Submission of Form-1, Pre Feasibility Report (PFR), EMP, and Approved Mining… — under environmental review, 1.9 km away
All 3 R K Transport projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.