Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Aug 2023 |
| Application filed | 22 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri Ravaraja |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Kala Pahar |
| Taluk / tehsil | Lalitpur |
| District | Lalitpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00299 |
In context
75 applications in Lalitpur since January 2022 are in the same category (Mining): 59 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.6 acres, this one is smaller than 81% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 14.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Kala Pahar, Lalitpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Area- 4.896 Ha Granite Dimensional Stone Mining project at Araji/… — lapsed, 500 m away
- Granite Dimensional Stone Deposit located at Arazi No. 28/4, Village:… — environmental approval granted, 1.2 km away
- Dimensional stone (granite) from Plot Nos. 749, 750, 751, 752, 753 /6, 753 /1,… — under environmental review, 2.4 km away
- Dimensional stone (granite) from Plot Nos. 749, 750, 751, 752, 753 /6, 753 /1,… — cleared for impact study, 2.4 km away
- Dimensional Stone (Granite) From Plot No. 740/3 and 740 Mi — under environmental review, 2.7 km away
- Dimensional Stone (Granite) From Plot No. 740/3 and 740 Mi — cleared for impact study, 2.7 km away
- Granite Dimensional Stone Deposit Village: - Bharatpura, Tehsil-Lalitpur… — lapsed, 2.7 km away
- Area 1.9546 Ha Granite Sized Dimensional Stone Mining project at Araji/… — environmental approval granted, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.