What is Developing? Open the mapMap

Cleared for impact studyMining · Hamirpur, Uttar Pradesh

"Sand/Morrum Mining" from Riverbed of Betwa River

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Bhendi Danda, Sarila, Hamirpur, Uttar Pradesh. The site covers 60 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Sept 2023).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Betwa River?

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Bhendi Danda, Sarila, Hamirpur, Uttar Pradesh. The site covers 60 acres.

Who is building it?

The applicant is Vijay Gupta.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Sept 2023), as of 27 Nov 2026.

Where is it?

In Bhendi Danda, Sarila, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1 crore and a site of 60 acres.

When was it filed?

The application was filed on 13 Sept 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River

Project details

Official title"Sand/Morrum Mining" from Riverbed of Betwa River at Village- Bhedi Kharka, (Gata No. 23/21, Area- 24.291 ha.) Tehsil- Sarila, District- Hamirpur, Uttar Pradesh, Project Proponent- Maa Vaishno Rice Mill (Shri Vijay Prakash Gupta)
StatusCleared for impact study
Status since13 Sept 2023
Application filed13 Sept 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantVijay Gupta
Land area60 acres (24.3 ha)
Project cost₹1 crore
Village / localityBhendi Danda
Taluk / tehsilSarila
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00350

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 15 Mar 2024Environmental approval granted60 acres₹1 crore
Early planning filed 13 Sept 2023 (this page)Cleared for impact study60 acres₹1 crore

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 60 acres, this one is larger than 59% of them.

5 other mining leases have applied within 500 m of this site; together with this one they cover 204.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.

Where it is

Bhendi Danda, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vijay Gupta in Hamirpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.