Quick answers
What is Building Stone (Sand Stone) Mine?
Building Stone (Sand Stone) Mine is an approved mining project in Darhiram, Mirzapur, Uttar Pradesh. The site covers 3.5 acres.
Who is building it?
The applicant is Shyamji Tripathi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Feb 2023), as of 27 Nov 2026.
Where is it?
In Darhiram, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹98 lakh and a site of 3.5 acres.
When was it filed?
The application was filed on 1 Feb 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Feb 2023 |
| Application filed | 1 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shyamji Tripathi |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Darhiram |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00360 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.5 acres, this one is larger than 57% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Darhiram, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone As Sandstone Khanda, Boulder, Gitti Mining Project — environmental approval granted, 2.5 km away
- Building Stone (Sand Stone) Mine — environmental approval granted, 2.5 km away
- Proposed project Building Stone, Sandstone, Quartzite, Ballast & Gitti Mining… — under environmental review, 2.6 km away
- Expansion of Mirzapur Thermal Power Plant from 1600 (2x800) MW (Phase I) to… — more information requested, 3.2 km away
- Transfer of Environmental Clearance (Change in Name) subsequently to NCLT… — environmental approval granted, 3.2 km away
- 2x800 MW Coal based Ultra Super Critical Thermal Power Project (TPP) — environmental approval granted, 3.2 km away
- 2x800 MW Coal based Ultra Super Critical Thermal Power Project (TPP) — cleared for impact study, 3.2 km away
- Diversion of forest land for construction of approach road & development of… — lapsed, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.