One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Grain Based Distillery Capacity – 60 Kld by M/S Glyco Aruna Private Limited
Project details
| Official title | Establishment of Proposed Grain Based Distillery Capacity – 60 Kld Along With Co Gen Power of 2.0 MW at Village: Gopalpur Dubey, Tehsil: Kadipur, District: Sultanpur, Uttar Pradesh by M/S Glyco Aruna Private Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 15 Apr 2023 |
| Application filed | 15 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Glyco Aruna Private Limited |
| Land area | 8.2 acres (3.3 ha) |
| Project cost | ₹80 crore |
| Village / locality | Gopalpur Dube |
| Taluk / tehsil | Kadipur |
| District | Sultanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00394 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Nov 2023 | Environmental approval granted | 8.2 acres | ₹80 crore |
| Early planning filed 15 Apr 2023 (this page) | Cleared for impact study | 8.2 acres | ₹80 crore |
Where it is
Gopalpur Dube, Kadipur, Sultanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Grain Based Distillery Capacity – 60 Kld by M/S Glyco Aruna Private… — environmental approval granted, 0 m away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 11.1 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) Sultanpur at… — cleared for impact study, 14.6 km away
- Protected Forest Land Proposed to Be Diverted for the Widening and… — lapsed, 15.8 km away
- Protected Forest Land Proposed to Be Diverted for the Widening and… — lapsed, 15.8 km away
- Bharat Net — lapsed, 19.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 24.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 24.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.