What is Developing? Open the mapMap

Cleared for impact studyMining · Mirzapur, Uttar Pradesh

"Building stone (Sandstone)" Mine at Arazi/Gata No.- 36/6/5, Village– Sonbarsa, Tehsil-Lalganj, District–Mirzapur, Uttar Pradesh, Project Proponent- Shri Subhash Singh

"Building stone (Sandstone)" Mine at Arazi/Gata No.- 36/6/5, Village– Sonbarsa, Tehsil-Lalganj, District–Mirzapur, Uttar Pradesh, Project Proponent- Shri Subhash Singh is a proposed mining project in Sonbarsa, Lalganj, Mirzapur, Uttar Pradesh. The site covers 2 acres. Its stated project cost is ₹88 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 25 Aug 2023).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building stone (Sandstone)" Mine at Arazi/Gata No.- 36/6/5, Village– Sonbarsa, Tehsil-Lalganj, District–Mirzapur, Uttar Pradesh, Project Proponent- Shri Subhash Singh is a proposed mining project in Sonbarsa, Lalganj, Mirzapur, Uttar Pradesh. The site covers 2 acres.

Who is building it?

The applicant is Subhash Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 25 Aug 2023), as of 27 Nov 2026.

Where is it?

In Sonbarsa, Lalganj, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹88 lakh and a site of 2 acres.

When was it filed?

The application was filed on 25 Aug 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Building stone (Sandstone)" Mine at Arazi/Gata No.- 36/6/5, Village– Sonbarsa,…

Project details

StatusCleared for impact study
Status since25 Aug 2023
Application filed25 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSubhash Singh
Land area2 acres (0.8 ha)
Project cost₹88 lakh
Village / localitySonbarsa
Taluk / tehsilLalganj
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00422

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 6 May 2024Environmental approval granted2 acres₹88 lakh
Early planning filed 25 Aug 2023 (this page)Cleared for impact study2 acres₹88 lakh

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2 acres, this one is smaller than 95% of them.

7 other mining leases have applied within 500 m of this site; together with this one they cover 16.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.

Where it is

Sonbarsa, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Subhash Singh in Mirzapur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.