What is Developing? Open the mapMap

Cleared for impact studyMining · Mahoba, Uttar Pradesh

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 1 (Khand No.- 09), Village- Baghwa, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.580 ha.), Prop.- Shri Harish Kumar Sahu S/o Shri Raja Bhaiya Sahu

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 1 (Khand No.- 09), Village- Baghwa, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.580 ha.), Prop.- Shri Harish Kumar Sahu S/o Shri Raja Bhaiya Sahu is a proposed mining project in Baghwa, Mahoba, Uttar Pradesh. The site covers 1.4 acres. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Dec 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 1 (Khand No.- 09), Village- Baghwa, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.580 ha.), Prop.- Shri Harish Kumar Sahu S/o Shri Raja Bhaiya Sahu is a proposed mining project in Baghwa, Mahoba, Uttar Pradesh. The site covers 1.4 acres.

Who is building it?

The applicant is Harish Sahu.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 30 Dec 2023), as of 27 Nov 2026.

Where is it?

In Baghwa, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh and a site of 1.4 acres.

When was it filed?

The application was filed on 30 Dec 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 1…

Project details

StatusCleared for impact study
Status since30 Dec 2023
Application filed30 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantHarish Sahu
Land area1.4 acres (0.6 ha)
Project cost₹65 lakh
Village / localityBaghwa
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00429

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Jan 2025Environmental approval granted1.4 acres₹65 lakh
Early planning filed 30 Dec 2023 (this page)Cleared for impact study1.4 acres₹65 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 91% of them.

7 other mining leases have applied within 500 m of this site; together with this one they cover 28.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.

Where it is

Baghwa, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.