Quick answers
What is this project?
"Sand/ Morrum Mining" Project at Adhawal Composite-1 Gata No.- 402 to 404, 432 to 436, 438, 440 to 453, 468 to 473, 480 to 488, Village- Adhawal, Tehsil- Fatehpur, District- Fatehpur, U.P. (Applied Area : 30.0 ha.) for Shri Alok Mishra S/o Late Shri Prakash Mishra is an approved mining project in Arhawal Aihatmali, Fatehpur, Uttar Pradesh. The site covers 74.1 acres.
Who is building it?
The applicant is Alok Mishra.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Mar 2023), as of 27 Nov 2026.
Where is it?
In Arhawal Aihatmali, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹83 lakh and a site of 74.1 acres.
When was it filed?
The application was filed on 17 Mar 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Mar 2023 |
| Application filed | 17 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Alok Mishra |
| Land area | 74.1 acres (30 ha) |
| Project cost | ₹83 lakh |
| Village / locality | Arhawal Aihatmali |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00483 |
In context
62 applications in Fatehpur since January 2022 are in the same category (Mining): 42 approved, 18 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 74.1 acres, this one is larger than 60% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Arhawal Aihatmali, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/ Morrum Mining" Project at Gata No.- 402 to 404, 432 to 436, 438, 440 to… — cleared for impact study, 0 m away
- "Sand/Morrum Mining Project" at Gata No. 376MI, 377MI, 374MI, 415MI, 414MI,… — cleared for impact study, 600 m away
- "Sand/ Morrum Mining" Project at Adhawal Composite-2 Gata No.- 331, 333 to… — cleared for impact study, 1.2 km away
- "Sand/ Morrum Mining" Project at Adhawal Composite-2 Gata No.- 331, 333 to… — environmental approval granted, 1.2 km away
- "Sand/Moram Mining Project" having an area of 45.00 Ha., located at Yamuna… — cleared for impact study, 1.2 km away
- Sand/ Morrum Mining from Yamuna Riverbed — environmental approval granted, 1.8 km away
- Sand/ Morrum Mining from Yamuna Riverbed — cleared for impact study, 1.8 km away
- Sand/Morrum Mining Project (Gata no-299,300,305,306,325mi,326mi, 327, mi) area… — lapsed, 2.1 km away
More from Alok Mishra in Fatehpur
- "Sand/ Morrum Mining" Project at Gata No.- 402 to 404, 432 to 436, 438, 440 to… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.