Quick answers
What is this project?
"Gitti/ Patthar" Project at Gata No.- 587 (Khand No.- 06) , Village- Nahari, Tehsil- Naraini, District- Banda, U.P. (Applied Area : 2.00 ha.) M/s Gaudeen Singh Contractor & Supplier Prop.- Shri Gaudeen Singh S/o Shri Raj Kumar Singh is a proposed mining project in Nahari, Naraini, Banda, Uttar Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Gaudeen Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Aug 2023), as of 27 Nov 2026.
Where is it?
In Nahari, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹66 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 16 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Gitti/ Patthar" Project at Gata No.- 587 (Khand No.- 06) , Village- Nahari, Tehsil-…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Aug 2023 |
| Application filed | 16 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Gaudeen Singh |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹66 lakh |
| Village / locality | Nahari |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00502 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 May 2024 | Environmental approval granted | 4.9 acres | ₹66 lakh |
| Early planning filed 16 Aug 2023 (this page) | Cleared for impact study | 4.9 acres | ₹66 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 92% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 16.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Nahari, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Gitti/ Patthar" Project at Gata No.- 587 (Khand No.- 06) , Village- Nahari,… — environmental approval granted, 0 m away
- Gitty/Stone Mine at Gata No. 587, Khand No. 04, Area- 2.00 Ha, Village-… — environmental approval granted, 150 m away
- Gitty/Stone Mine at Gata No. 587, Khand No. 04, Area- 2.00 Ha, Village-… — cleared for impact study, 150 m away
- Building stone (Gitti/Patthar & Pahari Morrum) mine at Gata No.-587 (Khand… — under environmental review, 200 m away
- Building stone (Gitti/Patthar) mine at Gata No.- 587 (Khand No.–01) Lease… — under environmental review, 300 m away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending, 1.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 3.8 km away
- "Morrum Mining" at Village- Barsandamanpur, Gata No.- 478, 479, 480, 481,… — more information requested, 4.3 km away
More from Gaudeen Singh in Banda
- "Gitti/ Patthar" Project at Gata No.- 2450 (Khand No.- 02), Village- Jarar,… — under environmental review
- "Gitti/ Patthar" Project at Gata No.- 2450 (Khand No.- 02), Village- Jarar,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.