What is Developing? Open the mapMap

Environmental approval grantedMining · Lucknow, Uttar Pradesh

"Ordinary Earth Excavation/Mining Project" at Gata No.- 1290, 1398

"Ordinary Earth Excavation/Mining Project" at Gata No.- 1290, 1398 is an approved mining project in Malha, Malihabad, Lucknow, Uttar Pradesh. The site covers 2.2 acres. Its stated project cost is ₹13 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 30 Aug 2023).

See it on the live map All projects in Lucknow

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official title"Ordinary Earth Excavation/Mining Project" at Gata No.- 1290, 1398 in Village: Malaha, Tehsil: Malihabad, District-Lucknow, Uttar Pradesh. (Lease Area: 0.906 Ha.).
StatusEnvironmental approval granted
Status since30 Aug 2023
Application filed30 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRaju
Land area2.2 acres (0.9 ha)
Project cost₹13 lakh
Village / localityMalha
Taluk / tehsilMalihabad
DistrictLucknow
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00526

In context

69 applications in Lucknow since January 2022 are in the same category (Mining): 61 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.2 acres, this one is smaller than 54% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 8.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Malha, Malihabad, Lucknow, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Raju in Lucknow

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.