Environmental approval grantedMining · Mirzapur, Uttar Pradesh

"Building stone (Sandstone)" Mine at Arazi/Gata No.- 484, Village– Devri Kalan, Tehsil-Madihan, District–Mirzapur, Uttar Pradesh Developed by Shri Dhirendra Kumar Singh & Smt. Divyalata Dubey

"Building stone (Sandstone)" Mine at Arazi/Gata No.- 484, Village– Devri Kalan, Tehsil-Madihan, District–Mirzapur, Uttar Pradesh Developed by Shri Dhirendra Kumar Singh & Smt. Divyalata Dubey is an approved mining project in Danti Koilara, Mirzapur, Uttar Pradesh. The site covers 2.5 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Nov 2023).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building stone (Sandstone)" Mine at Arazi/Gata No.- 484, Village– Devri Kalan, Tehsil-Madihan, District–Mirzapur, Uttar Pradesh Developed by Shri Dhirendra Kumar Singh & Smt. Divyalata Dubey is an approved mining project in Danti Koilara, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.

Who is building it?

The applicant is Dhirendra Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 1 Nov 2023), as of 27 Nov 2026.

Where is it?

In Danti Koilara, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹85 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 1 Nov 2023.

Project details

StatusEnvironmental approval granted
Status since1 Nov 2023
Application filed1 Nov 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantDhirendra Singh
Land area2.5 acres (1 ha)
Project cost₹85 lakh
Village / localityDanti Koilara
Taluk / tehsilMirzapur
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00559

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Nov 2023 (this page)Environmental approval granted2.5 acres₹85 lakh
Early planning filed 2 May 2023Cleared for impact study2.5 acres₹85 lakh

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.

Where it is

Danti Koilara, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dhirendra Singh in Mirzapur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.