Quick answers
What is Area 0.809 Ha Sandstone(Building Stone) mining project?
Area 0.809 Ha Sandstone(Building Stone) mining project is an approved mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Ramendra Narayan Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 May 2023), as of 27 Nov 2026.
Where is it?
In Dhuria, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹66 lakh and a site of 2 acres.
When was it filed?
The application was filed on 1 May 2023.
Project details
| Official title | Area 0.809 Ha Sandstone(Building Stone) mining project at Araji No'. 428 Village-Dhuriya, Tehsil-Chunar, District- Mirzapur, U.P. |
|---|---|
| Status | Environmental approval granted |
| Status since | 1 May 2023 |
| Application filed | 1 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ramendra Narayan Singh |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹66 lakh |
| Village / locality | Dhuria |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00568 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2 acres, this one is smaller than 95% of them.
24 other mining leases have applied within 500 m of this site; together with this one they cover 80 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 74 mining leases have applied within 5 km.
Where it is
Dhuria, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Building Stone (Sand Stone)" Project at Gata No.- 428 (V.K.- 38),… — cleared for impact study, 50 m away
- "Building Stone (Sand Stone)" Project at Gata No.- 428 , Village- Dhuria,… — cleared for impact study, 100 m away
- Building Stone (Sand Stone) — environmental approval granted, 150 m away
- Building Stone (Sand Stone) — cleared for impact study, 150 m away
- Proposed "Building Stone (Sand Stone)" Project at Gata No.- 428, Village-… — cleared for impact study, 200 m away
- Building Stone (sandstone) mine, (lease area 1.01 ha., Gata No.- 428)… — environmental approval granted, 200 m away
- Dhuriya Building stone Sand Stone Mining project — environmental approval granted, 250 m away
- Dhuriya Building stone Sand Stone Mining project — more information requested, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.