Project details
| Official title | Expansion of Distillery From 200 Kld (B-Heavy Molasses) to 450 Kld Through Addition of 250 Kld Distillery (B-Heavy Molasses/Cane Juice Syrup/Grains) Along With Cogeneration Power Plant From 7.0 MW to 10.0 MW Under Ebp at Vill- Sabitgarh, Karora, Teh – Khurja & Distt - Bulandshahar, Up by M/S Triveni Engineering & Industries Limited, Unit Sabitgarh |
|---|---|
| Status | Environmental approval granted |
| Status since | 2 Jan 2024 |
| Application filed | 21 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Triveni Engineering & Industries Limited |
| Land area | 41.2 acres (16.7 ha) |
| Project cost | ₹418 crore |
| Village / locality | Karora |
| Taluk / tehsil | Khurja |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00619 |
In context
10 applications in Bulandshahr since January 2022 are in the same category (Industry): 6 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 41.2 acres, this one is larger than 50% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karora, Khurja, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "no Increase in Pollution Load Certificate" for Proposed Expansion of Existing… — initial checks, 50 m away
- "no Increase in Pollution Load Certificate" for Proposed Expansion of Existing… — initial checks, 50 m away
- Expansion of existing Sugar unit from 7000 TCD to 10,000 TCD and expansion in… — environmental approval granted, 450 m away
- Expansion of existing Sugar unit from 7000 TCD to 10,000 TCD and expansion in… — cleared for impact study, 450 m away
- Re-diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 9.7 km away
- Khurja Super Thermal Power Project — lapsed, 10.1 km away
- Khurja Super Thermal Power Project Stage-II (1*800 MW) — lapsed, 10.1 km away
- Re-Diversion of 16.94 Ha Forest Land Coming Under NH-91 From Chainage Numbers… — forest land use approved, 10.4 km away
More from Triveni Engineering & Industries Limited in Bulandshahr
5 Triveni Engineering and projects in Bulandshahr
All 14 Triveni Engineering and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.