Quick answers
What is Kurra Kanak (K2) Sand/Morum Mining?
Kurra Kanak (K2) Sand/Morum Mining is a proposed mining project in Kurrakanak, Fatehpur, Uttar Pradesh. The site covers 100 acres.
Who is building it?
The applicant is Kanwar Enterprises Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kurrakanak, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh and a site of 100 acres.
When was it filed?
The application was filed on 1 Feb 2023.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 1 Feb 2023 |
| Application filed | 1 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kanwar Enterprises Private Limited |
| Land area | 100 acres (40.5 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Kurrakanak |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00624 |
In context
62 applications in Fatehpur since January 2022 are in the same category (Mining): 42 approved, 18 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 100 acres, this one is larger than 87% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 265.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Kurrakanak, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance of Proposed Riverbed Sand/Morrum Mining Having Lease… — environmental approval granted, 0 m away
- Environment Clearance of Proposed Riverbed Sand/Morrum Mining Having Lease… — cleared for impact study, 0 m away
- Riverbed Sand/Morrum mining having lease area 21.736 ha along River Yamuna in… — environmental approval granted, 400 m away
- Riverbed Sand/Morrum mining having lease area 21.736 ha along River Yamuna in… — cleared for impact study, 400 m away
- Riverbed Sand/Morrum mining having lease area 21.736 ha along River Yamuna in… — environmental approval granted, 400 m away
- Sand/ Morrum Mining from Yamuna River bED — environmental approval granted, 400 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 700 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 700 m away
More from Kanwar Enterprises Private Limited in Fatehpur
- Environment Clearance of Proposed Riverbed Sand/Morrum Mining Having Lease… — environmental approval granted
- Environment Clearance of Proposed Riverbed Sand/Morrum Mining Having Lease… — cleared for impact study
All 3 Kanwar Enterprises projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.