Quick answers
What is Ordinary Soil Excavation Project?
Ordinary Soil Excavation Project is an approved mining project in Alladadpur, Kaiserganj, Bahraich, Uttar Pradesh. The site covers 0.3 acres.
Who is building it?
The applicant is Vaibhav Agarwal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Apr 2023), as of 27 Nov 2026.
Where is it?
In Alladadpur, Kaiserganj, Bahraich, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 0.3 acres.
When was it filed?
The application was filed on 24 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Apr 2023 |
| Application filed | 24 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vaibhav Agarwal |
| Land area | 1,400 m² |
| Project cost | ₹80 lakh |
| Village / locality | Alladadpur |
| Taluk / tehsil | Kaiserganj |
| District | Bahraich |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00628 |
In context
20 applications in Bahraich since January 2022 are in the same category (Mining): 18 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.3 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Alladadpur, Kaiserganj, Bahraich, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Earth Excavation, Village-Jadaupur, Tehsil-Mahasi, District-Bahraich,… — environmental approval granted, 2.5 km away
- Proposal of re-diversion for Jio Digital Fibre Private Limited Project for… — more information requested, 2.6 km away
- Ordinary Soil Excavation Mine — environmental approval granted, 2.7 km away
- Ordinary Soil Excavation Mine — environmental approval granted, 3.7 km away
- Re-diversion for Jio Digital Fibre Private Limited Project for Laying of… — lapsed, 6.5 km away
- Railway Over Bridge — in-principle approval, conditions pending, 12.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 12.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 12.9 km away
More from Vaibhav Agarwal in Bahraich
- Ordinary Soil Excavation Mine — environmental approval granted
- Ordinary Soil Excavation Mine — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.