One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Existing Sugar Unit From 8500 Tcd to 12000 Tcd Without Change in Existing…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Mar 2023 |
| Application filed | 13 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/S Seksaria Biswan Sugar Factory Limited (Sbsfl) |
| Land area | 53 acres (21.5 ha) |
| Project cost | ₹276 crore |
| Village / locality | Biswan |
| Taluk / tehsil | Biswan |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00645 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 18 May 2024 | Environmental approval granted | 53 acres | ₹276 crore |
| Early planning filed 13 Mar 2023 (this page) | Cleared for impact study | 53 acres | ₹276 crore |
In context
12 applications in Sitapur since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 53 acres, this one is larger than 83% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Biswan, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Sugar Unit From 8500 Tcd to 12000 Tcd Without Change in… — environmental approval granted, 50 m away
- No Increase in Pollution Load for Operation of Existing Distillery on C Heavy… — initial checks, 150 m away
- Expansion of Existing 81 Kld Distillery Upto 166 Kld B-Heavy/Cane Syrup Based… — environmental approval granted, 150 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 600 m away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 1.7 km away
- Proposed Protected Forest Land to be diverted for Construction of 02 Lane… — lapsed, 2 km away
- Ordinary Earth Mining Project Gata No.-517, 989Aa — returned to applicant, 2.5 km away
- Mining of Minor Mineral Ordinary Soil — environmental approval granted, 2.9 km away
More from M/S Seksaria Biswan Sugar Factory Limited (Sbsfl) in Sitapur
- No Increase in Pollution Load for Operation of Existing Distillery on C Heavy… — initial checks
- Expansion of Existing 81 Kld Distillery Upto 166 Kld B-Heavy/Cane Syrup Based… — environmental approval granted
All 4 Seksaria Biswan Sugar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.