Quick answers
What is Botaha Ordinary Sand Mining Project on Ghaghra River?
Botaha Ordinary Sand Mining Project on Ghaghra River is an approved mining project in Bhutaha, Ghanghata, Sant Kabir Nagar, Uttar Pradesh. The site covers 26.2 acres.
Who is building it?
The applicant is Angad Vishwakarma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Jul 2023), as of 27 Nov 2026.
Where is it?
In Bhutaha, Ghanghata, Sant Kabir Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹88 lakh and a site of 26.2 acres.
When was it filed?
The application was filed on 10 Jul 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Jul 2023 |
| Application filed | 10 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Angad Vishwakarma |
| Land area | 26.2 acres (10.6 ha) |
| Project cost | ₹88 lakh |
| Village / locality | Bhutaha |
| Taluk / tehsil | Ghanghata |
| District | Sant Kabir Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00909 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Jul 2023 (this page) | Environmental approval granted | 26.2 acres | ₹88 lakh |
| Early planning filed 18 Oct 2022 | Cleared for impact study | 26.2 acres | ₹88 lakh |
In context
10 applications in Sant Kabir Nagar since January 2022 are in the same category (Mining): 7 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 26.2 acres, this one is larger than 80% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Bhutaha, Ghanghata, Sant Kabir Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Botaha Ordinary Sand Mining Project on Ghaghra River — cleared for impact study, 0 m away
- Ordinary Sand Mine — environmental approval granted, 1.7 km away
- Ordinary Sand Mine — cleared for impact study, 1.7 km away
- Proposed project of Ordinary Sand Mining project at Gata No.- 3225, Area-… — environmental approval granted, 7.4 km away
- "Ordinary Sand Mining at Ghaghara River Bed Project" at Gata No. 1608 Da,… — under environmental review, 16.8 km away
- "Ordinary Sand Mining at Ghaghara River Bed Project" at Gata No. 1608 Da,… — cleared for impact study, 16.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 18.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 20.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.