Project details
| Official title | Proposed project of Cement Grinding Unit for proposed production of 2.5 MTPA at Village-Dharouli, Madhupur, Pargana, Tehsil-Patti, Distt-Pratapgarh, UP - 230135 by M/s Kanodia Cem Pvt Ltd |
|---|---|
| Status | Environmental approval granted |
| Status since | 7 Oct 2023 |
| Application filed | 7 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Kanodia Cem Private Limited |
| Land area | 27.4 acres (11.1 ha) |
| Project cost | ₹472.7 crore |
| Village / locality | Dharauli |
| Taluk / tehsil | Patti |
| District | Pratapgarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00996 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 27.4 acres | ₹472.7 crore |
| New project filed 7 Oct 2023 (this page) | Environmental approval granted | 27.4 acres | ₹472.7 crore |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dharauli, Patti, Pratapgarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Cement Grinding Unit for proposed production of 2.5 MTPA… — cleared for impact study, 550 m away
- Proposed BPCL Retail Outlet on Pratapgarh to Sultanpur Road NH-330 (Old NH-96)… — forest land use approved, 3.2 km away
- City Gas Distribution network in Pratapgarh — more information requested, 11.4 km away
- Proposed Protected Forest Land to be diverted for Rehabilitation and… — lapsed, 12.8 km away
- Protected Forest Land proposed to be diverted for the Construction of CC Road… — lapsed, 15.7 km away
- Protected Forest Land proposed to be diverted for the Construction of CC Road… — forest land use approved, 15.7 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit Approach to HPCL… — forest land use approved, 20.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — lapsed, 21.4 km away
All 4 Kanodia Cem projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.