Quick answers
What is this project?
"Building Stone (Sand Stone)" Project at Gata No.- 146, Village- Devarikalan, Tehsil- Madihan, District- Mirzapur, U.P. (Applied Area : 2.02 ha./ 5.0 Acre) Prop.- Shri Pankaj Kumar Pandey S/o Late Yagaya Narayan Pandey is an approved mining project in Dewari, Mirzapur, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Pankaj Pandey.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Sept 2023), as of 27 Nov 2026.
Where is it?
In Dewari, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹72 lakh and a site of 5 acres.
When was it filed?
The application was filed on 14 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Sept 2023 |
| Application filed | 14 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pankaj Pandey |
| Land area | 5 acres (2 ha) |
| Project cost | ₹72 lakh |
| Village / locality | Dewari |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01041 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5 acres, this one is larger than 70% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Dewari, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 1.4 km away
- Building Stone (Sandstone) at Gata No.- 478, Village- Devri Kalan, Tehsil-… — cleared for impact study, 1.7 km away
- Proposed project of "Sand Stone Quartizite Ballast Gitti Mining" located at… — environmental approval granted, 2.1 km away
- Proposed project of "Sand Stone Quartizite Ballast Gitti Mining" located at… — cleared for impact study, 2.1 km away
- Maa Vindhyavasini State University, Mirzapur, at Devri Kala, Tehsil -… — lapsed, 2.2 km away
- "Building Stone (Sand Stone)" Project at Gata No.- 488/2 & 488/3, Village-… — lapsed, 2.4 km away
- "Building Stone (Sand Stone)" Project at Gata No.- 488/2 & 488/3, Village-… — cleared for impact study, 2.4 km away
- Building Stone (Sand stone) Mining Project — environmental approval granted, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.