Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Sept 2023 |
| Application filed | 13 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shiv Tripathi |
| Land area | 101.5 acres (41.1 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Chandi Khadar |
| Taluk / tehsil | Karwi |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01066 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Sept 2023 (this page) | Environmental approval granted | 101.5 acres | ₹1.4 crore |
| Early planning filed 2 Mar 2023 | Cleared for impact study | 101.5 acres | ₹1.4 crore |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 101.5 acres, this one is larger than 90% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 158.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Chandi Khadar, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Ordinary Sand/ Morrum Mining from Riverbed of Yamuna River located at… — cleared for impact study, 0 m away
- Chandi Khadar Sand/Morrum Mining Project — under environmental review, 0 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — environmental approval granted, 450 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — cleared for impact study, 450 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — under environmental review, 500 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — under environmental review, 500 m away
- "Sand/Morrum Mine" located at Gata No. 2/2 (Khand No. 02), over an area of… — environmental approval granted, 800 m away
- "Sand/Morrum Mine" located at Gata No. 2/2 (Khand No. 02), over an area of… — under environmental review, 800 m away
More from Shiv Tripathi in Chitrakoot
- "Sand/Morrum Mining" from Riverbed of Yamuna River — initial checks
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.