Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Jun 2023 |
| Application filed | 6 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ujjawal Shukla |
| Land area | 9.6 acres (3.9 ha) |
| Village / locality | Bhorapur |
| Taluk / tehsil | Sadar |
| District | Lucknow |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01072 |
In context
69 applications in Lucknow since January 2022 are in the same category (Mining): 61 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.6 acres, this one is larger than 91% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Bhorapur, Sadar, Lucknow, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Reciprocal Warehousing — environmental approval granted, 1.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 1.9 km away
- Expansion of Industrial Shed for Manufacturing from 1500 MTPA to 6000 MTPA… — environmental approval granted, 4 km away
- "UP DEFENCE INDUSTRIAL CORRIDOR" — environmental approval granted, 4.3 km away
- "Ordinary Soil Mining Project" — environmental approval granted, 4.8 km away
- Ordinary Soil Mine — initial checks, 4.9 km away
- ITBP Approach Road at Village Kuroinee, Division Awadh Forest Division,… — lapsed, 5 km away
- ITBP Approach Road at Village Kuroinee, Division Awadh Forest Division,… — more information requested, 5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.